March 2015

  1. The pump in the well beside the two tanks has been replaced
  2. Two pressure tanks have been installed in unit 4.
  3. A new plumbing has been installed.
  4. A new pressure tank has been installed
  5. Two 2 hp pumps had to be replaced.

April 2015

  1. Two pressure tanks have been replaced with new ones.
  2. Two 2 hp pressure pumps have been replaced with new ones.
  3. A Pressure Reducer Vault has been installed to help control the pressure in unit 4.

Funds for the above was obtained from personel credit card credit of the owners. Without that the water company would have had to shut down.